Services
 

About Us

PVD Drilling Division always puts human factor in top priority for development. With a team of drilling experts from the most advanced countries such as Australia, England, France, United States, etc. and the local staff whose abilities are continuously improved, PVD Drilling Division is confident to be the pioneer in Vietnam’s oil and gas drilling industry.

PVD Drilling Division is a subsidiary that manages and operates 03 offshore rigs, 01 land rig (100% owned by PV Drilling) and 01 semi-submersible tender assist drilling (TAD) rig (62% owned by PV Drilling).

As the primary division in charge of the core business of PV Drilling, PVD Drilling Division always prioritizes to develop the human factor. With a team of drilling experts from the most advanced countries like Australia, England, France, United States, etc. and the local staff whose abilities are continuously improved, PVD Drilling Division is confident to be the pioneer in Vietnam oil and gas drilling industry.

Along with the constant training and development for the technical staff, PVD Drilling Division also stands in the forefront of integrating information technology into operation. The subsidiary currently applies many advanced management systems such as Maximo, Oracle, ERP, etc. Therefore, the operation and business activities of PVD Drilling Division always bring high economic efficiency.
2011 is the second year that PVD Drilling Division took advantage of the available resources of manpower and customer relationships to form partnership with international rig suppliers such as Maersk and Vantage, etc. and chartered 5 more rigs for Phu Quy POC, Salamander, Premier Oil, PVEP POC, and occupied over 50% market share of the drilling industry in Vietnam.

In 2011, under the direction of the corporation, PVD Drilling Division successfully put into operation the semi-submersible tender assist drilling (TAD) rig for Bien Dong POC’s drilling campaign; simultaneously, restarted the 3-year drilling project for joint venture GBRS in Sahara Desert, Algeria. All rig operations recorded high level of safety and efficiency (over 98%), which were greatly appreciated by clients. The management and operation of drilling rigs also achieved many outstanding accomplishments as follows:
The IADC (International Association of Drilling Contractors) acknowledged:

  • PV DRILLING I achieved four (4) consecutive years of operation without lost time incident (Zero LTI).
  • PV DRILLING II and III reached two (2) consecutive years of operation without lost time incident (Zero LTI).
Address: 4th Floor, Sailing Tower No. 111A Pasteur Street, Ben Nghe, District 1, Ho Chi Minh City
Tel: +84-28-39 142 012 (7 lines) - Fax: +84-28-39 142 021 - 39 142 022 - Website :
www.pvdrilling.com.vn 
© Copyrights 2013 PVD - Site by Time Universal.
28,168,532Visitors