News & Events
During the first 3 months of 2020, the Covid-19 pandemic broke out and quickly spread throughout the world with over 240,000 infected cases and 10,000 deaths, resulting in a sharp global recession
PV DRILLING I, officially put into operation on October 10th, 2007 is PV Drilling’s 1st wholly-owned jack-up rig. As of midnight on 9th November, 2019, PV DRILLING I reached the milestone of 13 consecutive years of safe operation without any Lost Time Incident , recognized by the International ...
In two days 3rd – 4th March 2020, the HSEQ Division – PV Drilling Corporation organized the inspection of Occupational Health – Safety – Environment at the bases as well as production facilities of Subsidiaries and Joint Ventures, located in Phu My and Dong Xuyen Industrial zones, Oil ...
As of midnight on 28th February, 2020, PV DRILLING VI reached the milestone of 5 consecutive years of safe operation without any Lost Time Incident, recognized by the International Association of Drilling Contractors
On December 16th 2019, the HSEQ Division – PV Drilling Corporation organized the inspection of Occupational Health – Safety – Environment at the bases as well as production facilities of subsidiaries, located in Phu My and Dong Xuyen Industrial zones, Oil Spill Response Base and PTSC Supply Base ...
total of 97 posts   Page [1/20]  
1 2 3 4 5 ...    
Address: 4th Floor, Sailing Tower No. 111A Pasteur Street, Ben Nghe, District 1, Ho Chi Minh City
Tel: +84-28-39 142 012 (7 lines) - Fax: +84-28-39 142 021 - 39 142 022 - Website :
www.pvdrilling.com.vn 
© Copyrights 2013 PVD - Site by Time Universal.
43,079,598Visitors